Pages

Tuesday, December 12, 2017

Theatre Operations

I might say "strangely enough" but it is not all that strange that my mind is leaning toward finding and acquiring a functional dark theatre to build "The Gnomes" (and other shows)

I'm facing some difficult, if not insurmountable challenges with the current studio location. Although the studio is well on it's way to being a very functional work space for production, manufacturing, and sales (and many other aspects of the operation) there are severely undesirable elements which are imposing themselves upon my sphere of creativity and functionality.

These factors existed before and I, generally, have been able to circumvent them to stay on my mission, but now the situation has become exacerbated to degree that is beyond unacceptable. I see little choice but to remove myself from the scenario. Doing this will take an extreme amount of cost and effort on my part.

So, if that is the case, the only practical choice is to set up shop in a theatre.
Of course, shop facilities are a priority, in addition to a backlot. Viewing such a change as a "final move" means to me; replacing my existing facility with nothing less than what I already have, but adding a functional stage with the capability to open the house for an audience.

This would essentially become "The Theatrical Development Centre". The cost of doing this is in the millions, so it is even more critical that "The Gnomes of New Hope" be funded or sold.
All that being said; I am in search of a theatre and the right deal that will make that happen.
Let me know if this is up your alley.

AG

Saturday, December 02, 2017

Studio Operations

The Lion's-Share of the work on the Core Creative Materials is finished. I will need to shift back to Scoring the music, but the focus of attention needs to be, and has been, on refining the Studio Space to accommodate production personnel.

Thus far, I have considered the studio as a private working space, even though it is 10k sq ft, a pretty big private space. I like it that way, but considering that we are rapidly approaching the time when production activity will increase "on the floor" then my work area will need further refinement. I have to do it, but I will need a tool room, where the tools can be locked up. My habit is to keep the tools I am using at the work station, but if there is going to be more traffic on the floor, the I have to consider that.

The other very important objective is to Garner sufficient resources to pay back our current Front Money Investors, which is a substantial amount. A primary goal is to close out all the storage areas and bring those supplies back into the operation. As it stands now I have three semi-trailers and one shipping container in storage, which needs to be paid off and put back into active storage.

(In that regard; I'm looking for another International CO1600, 1700, or 1800 tractor to pull the semi-trailers)

I'm looking to pack the show into a single 35' semi, of which I have two. Of course, that size show will be for smaller venues.

Anyway, for those of you who have been patiently waiting to see enough action to believe there will be a return on your investment, I invite you to stop in the studio in Southampton to talk about things and look over our progress. Send me an email if you like, or just come in 9-5 m-f.

More later.  AG